Current release Spider Project: 18.04.23 Date: 19.07.2018
Spider Project version 17.02 release 106 - from 13.12.2017

  • A project truncation can be done from data date backwards.
  • New option "Perform cost / material calculation" in the "Truncate project by period" dialog.
  • The "Highrise construction diagram" diagram is improved. And it can be scaled horizontally (SHIFT + mouse wheel) and vertically (CTRL + mouse wheel).
  • Filters in the "Actual data input" table can be applied not only to activities but also to phases and resource assignments.
  • New option "Arrangement" on the "Rows and columns" page of the report wizard.
  • The resource constrained scheduling is speeded up.
 